ESTIMATE.
Main Head
Sub. Head
Bridges.
Minor Bridge No.15.
Work
Tares 10 ft. Aromes at chain 36*422
Drawing 0.R.E. 10.34582.
DESCRIPTION Quantity Unit Rate AMOUNT Cts. Excavation in foundations, 22,400 8 8 Item Timbering and pumping Concrete in foundations. 1,120 35/- 3,892 00 Masonry in superstructure 9,100 40/- 3,640 00 Masonry in arches. 1,950 3/- 3,900 00 Masonry in coping 275 2/- 650 Dry stone backing. 1,600 10/% 16 00 Total 13,024 00 Contingincies 10% 1,302 40 Grand Total 14,326 40RM C.R E. No. 24.
NOM
DTAMIT23
noolwort
RM C.R E. No. 24.
latof
01 zsionignitnod
leloT bas1D)
bash M
bnoft du
Kowloon Canton Railway.
112
BRITISH SECTION.
ESTIMATE.
Main Head
Sub. Head
Bridges.
Minor Bridge No.15.
·
Work
Tares 10 ft. Aromes at chain 36*422
Drawing 0.R.E. 10.34582.
AMOUNT.
uantity.
DESCRIPTION.
Rate. Unit.
Cts.
22,400
Excavation in foundations,
Item Timbering and pumping
1,120: Concrete in foundations.
9,100, Masonry in superstructure
1,950 Masonry in arches.
275 Masonry in coping
1,600 Dry stone backing.
10/%
226
00
800
35/-%
3,892, 00
|
40/- %
3,640 00
3/- 0.ft 2/- 0.ft
3,900 00
650
!
10/
%
16 00
8 8 8 8 8 8 8
00
Total
Contingincies 10%
13,024 00
1,302
40
Grand Total
14,326
40